Port of London Structural Alterations Project

1 day ago
1 min read

J&I carried out the following works as a complete package over 24 weeks:

  • Strip out works

  • Temporary works design and installations

  • Demolition of Roof buildings and roof structure

  • Demolition of internal floor slabs

  • Demolition of external stair structure

  • Demolition of Internal Stairs

  • Structural steel works to form new roof extension, lift shaft, new floor slabs throughout

  • Structural Steel staircases

  • Construction of new composite RC floor slabs

  • New Drainage installations

  • All Brick and Blockworks

  • All BWIC throughout inc new service penetrations & risers








 
 
 